Company Description
Dear sirs,
SYRUTEC INT is specialized in the Biomass Energy
Green Po
Syrutecr Stations, Gasification of any size
with standard Internal Combustion Engines from
300KW to 15.0MW, providing also solutions up to
even 50MW by steam etc.
We supply larger Power Stations of up-to 550MW
using of many other fuels as Coal, Gas, HFO, MSW,
RDF, Hydro and others.
We have a new revolutionary systems for Renewable
energy, mainly by Biomass sources.
We achieved a "Brake through" by converting
heavy diesel engines of 1.66MW Syngas operating
(low CV 1,250 Kcal/Kg), return of investment is
fast 10 to 12 months!!!, erection time is also 6
to 8 month from LC confirmation, IRR greater than
45% !.
We supply added system of CHP and Low Pressure
Steam by-product for other purposes.
You most welcome to see in 400, 800, 1,000KW
running, and 3.0MW in Philippines.
We Also have a full project of Green Power begins
from setting a plantation, new forest, with
special trees/grass ( 250 Tons/Hectare!), or
other to make very low cost power, we have trees
that can grow in salty soil/land, can make even
2.0MW from land of only 1,100m x 1,100m
(120Hectare!), and 10.0MW from a land of near
2,500 x 2,500m (620 Hectares!!).
Please contact for more information.