Cladding Solutions

Company Description

PHONE NO.:9999503780 E-mail address- ***** PROFILE Cladding Solutions ENGINEERING & BEYONS FEBRICATION & MECHANICAL CONTRACTOR, CONSULTANT Plot No-355, Sector-31 ( Near Main Market) Gurgaon - 122001 Introduction Cladding Solutions pleased to introduce Cladding Solutions, since Dec 2010 as an Electrical-Mechanical Contractor, & Maintenance service provider for operation, maintenance & Project work for the following services: 1 pipe & pipe fitting up to 28’ sizes (alloy steel, carbon steel stainless steel) 1 Electrification projects in all fields. (***** Industries, Multistorey Buildings, Residential flats.) 2 Electromechanical services (i. e. Sub Station & aux., Distribution & aux.Pump House/ Hydrant System.) 3 Building Maintenance: Building Management, HVAC, And All Jobs. MANAGEMENT OF ELECTRICAL PROJECT ON TURN KEY BASIS /LABOUR RATE 1 HT / LT equipment installation testing & commissioning. 33kv /11kv/ 0.433kv. 2 Erection, Testing & Commissioning of DG Set Electro-mechanical work. 3 Illumination of Buildings / Industries. 4 Installation of Cooling Tower & its piping work. 5 Installation, Interconnection & Commissioning of Machines. 6 Laying of Telephones and Computer Networking Cables and its Termination. 7. Installation testing & commissioning of electrical control panels. 8. Installation/ erection of HVAC work. MANAGEMENT OF ENGINEERING ACTIVITIES We provide operation and maintenance support of all Electro-mechanical installation as specified. We carry out preventive maintenance checks, spare parts management & control. Logbook would be maintained along with daily, weekly and monthly checklists. Reports will be generated on possibilities of cost reduction. Operation and maintenance of the following:- 1 DG Sets & Electrical Control Panels. 2 Water Plants. 3 Lift / Conveyers. 4 UPS / Servo Stabilizer / Inverter. 5 Fitting and Fixtures of Electrical Equipment. 6 Computer Networking Circuit & Termination. 7 Automation of Machine. 8 HVAC. MANAGEMENT OF ELECTRICAL POWER ACTIVITIES 1. Power factor improvement techniques. 2. Fuel management system Addition to these activities we do preventive maintenance Analysis of electrical equipment and installation. CONSULTANCY 1 Study of Electrical distribution network, Load calculation of equipment and improving system. 2 Load Pattern and efficiency of DG Set to justify usage of DG Set capacity as per schedule. 3 Design of Electrical System. 4 Study of air compressor and pneumatic system to improve system efficiency. LIST OF MAN POWER S. No. DESCRIPTION 1 Engineer 06 2 Supervisor / Foreman 10 3 DG Operate 06 4 Electrician 20 5 Wire man 15 6 Fitter 08 7 Welder 04 6 AC Mechanic 04 7 Helper - As per requirement 8 Plumber 02 9 Computer operator 01 10 Accountant 01 L Tools / Machinery: We have sufficient tools and machinery for Project/Maintenance Execution. Such as Welding M/c , Gas Cutter , Chopsa , Hammer Drill M/c , Jacks etc: Safety Norms at our Organization: >All staff/workers covered under ESI/PF & Insurance. >All Employees are provided with safety shoes, helmets and other desired accessories as needed. Safety has always been priority for our organization. Experience of following organizations: My self Narender Singh has worked with following organization : JAKSON ENGINEERS LTD. : TIGER STEEL ENGINEERING INDIA PVT LTD : PARASRAMPURIA SYNTHETICS LTD. : OCAP CHASSIS PARTS (INDIA) PVT LTD. (MNC) : AHLUWALIA COTRACT INDIA LTD. Project/ Maintenance work carried out in the following Organizations with our sister concern company AP Engineers:- 1. Logwell Forge Ltd. Gurgaon -Complete Plant re-electrification, & Maintenance. 2. Machino India Ltd. - Gurgaon - Maintenance & Electrical work. 3. DMRC IT Park Shahadra –panel installation & cable work 4. MGRM Net LTD SDA (New Delhi) AMC for maintenance& facility providing. 5. DLF Power Ltd Gurgaon (Office electrification work). 6. Ansal Build Well Ltd. (Electrification work) Internal & external electrification work of Florence club 7. AMWAY office interior electrification work, & Central A/c plant electrification work. 8. V3 S Mall Laxmi Nagar Central A/c plant electrification work. 9. Singapore high commission - (Electrification work VRV system) 10. TATA MOTORS LTD RUDRAPUR -( Electrification work of paint shop –Main vender Taikisha Engg India Ltd) Nov 07-March 2008 11. Ring road Rohini Mall HVAC work 12. NDMC CIVIC CENTRE New Delhi - Main vender IJM (Malaysia) & Siemens India Ltd. Since April 2008 (under execution) Current Portfolio 13. ACIL- Common wealth game Village (Electrical work under execution) 14. DMRC HVAC Operation & maintenance work (AMC) from dec 07 to till date. 15. Bharati Air tel IMT Manesar HVAC project work under execution. 16. Operation & maintenance services of IFCI Tower Nehru Place (AMC) New Delhi from January 2010 to till date. 17. Operation & maintenance services of Paharpur Business Centre Nehru Place (AMC) New Delhi We shall be glad to give our detailed Presentation on hearing from you. Thanking you For Cladding Solutions (partners)

Company Information

  • Contact Person:Mr. Narender singh
  • Department:Director
  • Telephone:
  • Mobile Phone:
  • Zip:122002
  • Business Type:Distributors/Wholesalers
  • Year Established:2010
  • Number Of Employees:6-10
  • Trade Capacity:Export Percentage:
  • Legal Representative / CEO:narender singh
  • Main Products:Pipe & Pipe Fitting,
  • Address:sector-31, gurgaon, haryana, India
  • Main Markets:Asia
Countries   China   India   Indonesia   Malaysia   Pakistan   Turkey   United Kingdom   United States   All Countries